Technical Reference

TheBOX® specifications

Electrical service, weight, footprint, capacity, and cycle times for receiving and installing a unit.

Electrical requirements

Electrical requirements for installing TheBOX®

Electrical requirements for installing TheBOX®
SpecificationValue
Voltage220 VAC
PhaseSingle-phase
Frequency50–60 Hz
CircuitDedicated run (not shared)
Amperage30 A
Plug/ReceptacleNEMA L6-30 (twist-lock, 250V/30A). The unit has an L6-30P plug. Install an L6-30R receptacle.
Leviton 2620 NEMA L6-30R flush-mount locking receptacle, black, marked 30A 250V

Receptacle to order

Leviton 2620 30 Amp, 250 Volt, Flush Mounting Locking Receptacle, Industrial Grade, Grounding, V-0-MAX, Black

Search on Amazon

Run a dedicated 220V single-phase circuit on a 30A breaker, typically 10 AWG wire (verify gauge per run length and local code), terminating in a NEMA L6-30R twist-lock receptacle. Ground per NEC/local code.

Unit specifications

TheBOX® unit specifications

TheBOX® unit specifications
SpecificationValue
Purification (Optional)45–60 minutes
Infusion Time7–25 minutes
Rehydration15–20 minutes
Operating Temperature80–92 °F
Capacity

Models from 2016–2020

  • V1 single chamber: 1–5 lbs per cycle
  • V1 dual chamber: 1–10 lbs per cycle

Models from 2021 to present (All Duality and Trinity models)

  • V2 single chamber: 1–7 lbs per cycle
  • V2 dual chamber: 1–15 lbs per cycle
  • V2 Ultra: 1–50 lbs per cycle
FootprintW45" × D35" × H77"
Weight500–600 lbs